As work continues on the construction of the Alto de São João – Toll section of the Mondego Mobility System, under the responsibility of Infraestruturas de Portugal, a change in road and pedestrian circulation in the confluence area of the Av. Emídio Navarro and Rua do Brasil, next to Parque Verde, essential for the safe execution of work.
This intervention, which is estimated to last 102 days, includes, in addition to the construction of the Parque do Metrobus station, the following operations:
- Connection to the sanitation network;
- Telecommunications network connection;
- Execution and connection of gutters;
- Execution of curbs and paving;
- Urban integration.
The recommended road alternatives are shown in the image.
During this period, the temporary stop of SMTUC and Alternative Services at Ramal da Lousã will be moved to the area indicated in the image.
It should be noted that to guarantee safe conditions for pedestrian circulation, specific alternative routes will be created for pedestrians, duly identified on site and permanently monitored during the intervention.